1. SWPPP Status Monitor
Stormwater Pollution Prevention Plan — Station B Site
Recent Rain Events
BMP Status — As of April 28
| BMP | Location | Status |
|---|---|---|
| Silt Fence | Perimeter — N/S/E | OK |
| Fiber Roll | Storm drain inlets | OK |
| Storm Drain Inlet Protection | Grid D inlet #3 | REPAIR NEEDED |
| Concrete Washout Area | Station B staging | OK |
| Tracking Control (rock pad) | Main site entrance | OK |
2. Noise Monitoring
Weekly average dB(A) vs. City threshold — 75 dB(A) daytime
Week 4/21 spike (68 dB): Attributed to concrete saw-cutting activity at Station A. Crew was operating two saws simultaneously. AI flagged the reading and recommended staggering operations — implemented April 24.
3. Air Quality — PM2.5 Monitoring
Particulate matter readings vs. EPA NAAQS threshold (35 μg/m³ 24hr)
Apr 24 spike (21.7 μg/m³): Correlated with saw-cutting day and onshore wind conditions. No SCAQMD threshold exceeded. AI recommends dust suppression water truck for future heavy saw-cutting days.