Safety Audit

Site safety reports from photos and inspector notes.

–70%time on safety documentation

🦺 Safety Audit Automation

Pre-filled safety audit with 5 categories and severity-rated findings. Click "Generate CAP" to produce a complete Corrective Action Plan with responsible parties and timelines — instantly.

SITE: Metro Station B DATE: April 28, 2026 AUDITOR: Eduardo Martinez 4M+ hours incident-free
Metro Blue Line Phase 3 — Station B
April 28, 2026
Eduardo Martinez, Safety Director
Skanska USA Civil West
4.1M+

Hours without recordable incident

Crestline CM — All Active Projects

Click any category to expand findings. Then click "Generate CAP" to produce the Corrective Action Plan.

🧗 Fall Protection
HIGH
Worker on scaffold without harness tie-off — Worker observed on scaffold at elevation ~18 ft. above grade at Station B south wall without fall arrest harness properly anchored. Worker was wearing harness but dorsal D-ring was not connected to lifeline. Corrective action issued on-site; worker removed from elevation pending retraining.
HIGH
Leading edge at open excavation not barricaded — 4 linear feet of excavation leading edge at Grid C lacked required warning line system. Area was within 6 ft. of pedestrian pathway. Barricade installed during audit.
MEDIUM
🥽 Personal Protective Equipment (PPE)
MEDIUM
Two workers not wearing safety glasses during concrete cutting — During saw-cutting operation at Station A slab, 2 of 4 workers were not wearing ANSI Z87.1 safety glasses. Grinding and cutting operations generate projectile hazards. Workers corrected immediately on site.
MEDIUM
Hard hats in good condition — no deficiencies noted. All workers observed with ANSI Z89.1 Class E hard hats in serviceable condition.
LOW
🧹 Housekeeping & Site Organization
LOW
Rebar offcuts not secured in designated storage area — Approximately 15 pieces of rebar offcut material observed in pedestrian walkway at Station B access path. No injury occurred. Material relocated during audit observation.
LOW
Overall site organization acceptable — Material staging areas well-organized. Laydown areas labeled. Waste containers present and not overflowing.
LOW
🔥 Fire Protection
MEDIUM
Fire extinguisher at Station B east portal overdue for annual inspection — ABC dry chemical fire extinguisher tag shows last annual inspection date of April 2025. Extinguisher not inspected in 12+ months per NFPA 10 requirements. Unit tagged out of service pending inspection.
MEDIUM
Hot work permit current and posted — Hot work permit for welding operations at Station B found current, signed by Skanska superintendent and Crestline safety rep. Fire watch in place. No deficiencies.
LOW
Electrical Safety
LOW
GFCI protection present on all temporary power outlets — All temporary power panels and extension cords verified with GFCI protection per OSHA 29 CFR 1926.404. No deficiencies noted.
LOW
Cord and plug inspection current — All extension cords color-coded for current inspection period. No exposed conductors or damaged insulation observed.
LOW
Generating Corrective Action Plan for all High and Medium findings...

Corrective Action Plan — Safety Audit SA-2026-B-04

Metro Blue Line Phase 3 | Station B | April 28, 2026 | Eduardo Martinez, Safety Director

Finding Severity Corrective Action Responsible Party Due Date Verification
Fall arrest harness not connected (scaffold, 18 ft.) HIGH Worker removed from elevation immediately. Mandatory fall protection retraining required for involved worker and entire scaffold crew before return to elevated work. Document completion. Skanska Safety Supervisor (M. Ortega) Before next elevated work (April 29, 2026) Training certificates, sign-in sheets reviewed by E. Martinez
Leading edge not barricaded at excavation MEDIUM Barricade installed during audit. Superintendent to conduct daily fall hazard inspection of all excavation leading edges. Document in daily safety inspection log. Skanska Superintendent (M. Ortega) Daily — ongoing Crestline safety walk weekly verification
Workers not wearing safety glasses during saw-cutting MEDIUM Immediate correction made on-site. Toolbox talk on PPE requirements for grinding/cutting to be conducted at next morning safety meeting (April 29). Skanska to document and submit sign-in sheet. Skanska Foreman April 29, 2026 Toolbox talk sign-in sheet submitted to E. Martinez
Fire extinguisher annual inspection overdue MEDIUM Unit tagged out of service. Skanska to have certified fire equipment company perform annual inspection. All fire extinguishers on site to be audited for current inspection tags. Replace unit if inspection fails. Skanska Safety Supervisor May 2, 2026 Current inspection tag verified by E. Martinez on next site visit
Rebar offcuts in pedestrian pathway LOW Material relocated during audit. Skanska foreman reminded of housekeeping standards. No further action required beyond documenting correction. Skanska Foreman Corrected on-site 4/28/2026 Documented in audit report — closed

Safety documentation that's complete before you leave the site.

Eduardo's team uses Purely Works to close out audits the same day. Let's build this for your safety program.

Book a 30-Min Call →

Want this built for your firm?

This is a hands-on taste, wired to placeholder data. In a 30-minute call we'll scope what your version looks like — plugged into your real systems, on your real workflow.