Proposal Team · for construction management and A/E firms

More shortlists. Fewer all-nighters.

A dedicated proposal manager, writer, and designer run your pursuits under your name, from go/no-go to submission and interview, so your principals review instead of write.

~63%
Won or shortlisted of decided pursuits
$1B+
In program ceilings across contracts won
< 1 wk
Fastest full proposal delivered end to end
SOQsRFQsProject-specific RFPsMATOC & IDIQOn-call benchesPrime & sub packagesShortlist interviews

You know these three weeks.

Firms rarely lose pursuits for lack of qualifications. They lose them to firms with the same qualifications and a proposal team that never stops.

The RFQ drops on a Thursday.

The PM who should lead it is on site all week. A principal opens the solicitation at 9 p.m., builds the compliance checklist herself, and hands out sections on Monday. Two weeks of senior time are gone before a paragraph is drafted.

With a lane: the compliance matrix, outline, and assignments come back in days, not weeks, and your principals start where only they add value: reviewing.

It's 11 p.m. and the layout isn't done.

The marketing coordinator is placing résumés while a principal is still reworking the approach section. Compliance gaps surface at the end, when there's no time to fix them well. What goes out shows the deadline, not the firm.

With a lane: we front-load the work, compliance matrix and outline first, drafts early, so the final days are review, not assembly.

You passed on the on-call.

Not because the firm isn't qualified. Because the last pursuit stretched the team thin, and nobody had the bandwidth to write this one well. The pursuits you decline are usually the new agencies and new scopes that would have grown the firm.

With a lane: small pursuits become routine, and a big one doesn't stop everything else.

The firms making shortlists aren't more qualified than you. They have a proposal team that never stops. Now you can have one without building it.

One lane. A whole proposal team.

A lane is a dedicated proposal manager, writer, and designer running one pursuit at a time, end to end, under your name. You keep the decisions and the sign-off. Everything else moves off your desk.

Your principals review instead of write

The RFP dissection, compliance matrix, outline, and assignments happen on our side. Your senior people read drafts and make calls, which is the part only they can do.

Submissions that read like your best work

Written in your voice from your library, laid out in InDesign, and checked against the evaluation criteria before they leave. The ~63% won-or-shortlisted rate is built on that discipline.

One flat number that comes in under one hire

A proposal manager, writer, and designer for less than the loaded cost of a single in-house proposal manager, with no hourly billing. Scope and terms are set on a short call.

Your three options, side by side.

Run the math for your firm →
Swipe to compare →
Build it in-house Hire a proposal consultancy Open a lane
The team you get One proposal manager, once the search is done. Design and QA still land on marketing. A senior consultant per pursuit. Your team still supplies the content and the layout. A proposal manager, writer, and designer, on every pursuit.
Who runs the process Your principals and marketing. Shared. You still chase inputs and own the schedule. We do. You review and approve.
Your principals' role Write, format, chase. Write. The consultant edits. Read, decide, sign off.
Between pursuits The salary continues. Nothing happens. Your library, résumés, and boilerplate get sharper for the next one.
When the pipeline spikes Hire again, or say no. Re-engage per pursuit, if they have capacity. Add a lane for the season. Hand it back after.
Cost shape Salary plus benefits, fixed. Per pursuit, often per hour. One flat monthly number. No hourly billing.
Under your name. In your tools. Yours to keep.

Nothing we produce says Purely Works. We work in your templates and your channels, and every draft, template, and the knowledge base we build for you is yours from day one. We don't publish client names, agency names, or contract titles, including on this page.

What a lane covers.

Every lane runs the core five on every pursuit. The rest are scoped on the call and switched on when you want them.

Core lane Every pursuit

Proposal management

A dedicated proposal manager owns the schedule, the meetings, the assignments, and the checklist, so nobody on your side has to.

Compliance matrix & outline

Every requirement, evaluation factor, and page limit mapped to a section and an owner before drafting starts.

Proposal writing

Approach, past performance, key personnel, and narrative sections in your voice, drawing on your library, with SME-driven technical approach sections where the RFP calls for them.

Graphic design & production

Covers, layouts, org charts, and graphics that look like the firm, laid out in InDesign and delivered print-ready and portal-ready.

Pink & red team reviews

A pink-team read of the draft and a red-team review of the laid-out proposal, both scored against the evaluation criteria, so gaps are found before the evaluator finds them.

Add when you need it Scoped on the call

Go / no-go & teaming strategy

Fit, capacity, incumbent strength, and win probability scored before you commit, plus who to bring on as subs, or who to join as a prime.

Strategy & storyboarding

Win themes and differentiators aligned to the evaluation criteria and to what your firm can actually prove, before anyone drafts a paragraph.

RFI & teaming coordination

Questions to the agency tracked; partner and sub inputs requested, collected, checked, and formatted to your standard so the designer can drop them straight in.

Submission management

Forms, assembly, final QA, and the upload or delivery, on time, with a checklist you can see.

Interview & shortlist prep

Presentation deck, anticipated questions, and rehearsal support for the shortlist interview.

Already have a contracts person who owns the RFIs, or a designer you like? Keep them. Working alongside your people lets us move faster, and their throughput multiplies.

How lanes work.

One lane runs one proposal at a time. Small pursuits clear in days, so a lane often clears several in a month. A large prime pursuit takes the whole lane. Add a lane for the busy season and hand it back after.

Illustrative quarter for one proposal lane, with a second lane added for the busy season Lane one runs a large prime pursuit for five weeks, then an SOQ, a data call, an RFQ response, and a mid-size pursuit. A second, optional lane absorbs an on-call SOQ and a second prime pursuit during the busy season. MONTH 1 MONTH 2 MONTH 3 Lane 1 Large prime pursuit · RFP SOQ Data call RFQ response Mid-size Lane 2 add for the season On-call SOQ Second prime pursuit · RFP → hand it back after
Lane 1, one quarter
  1. WEEKS 1–5Large prime pursuit · RFP
  2. WEEK 6SOQ
  3. WEEK 7Data call · RFQ response
  4. WEEKS 9–12Mid-size pursuit
  5. SEASONLane 2 added: on-call SOQ, second prime pursuit. Handed back after.
Large pursuit Small pursuit Seasonal lane
Illustrative quarter. The actual mix follows your pipeline.

Before the first pursuit

We load your past proposals, résumés, and project sheets into a knowledge base you own, and learn your voice and your review process. Proposal one reads like your firm. Proposal ten is faster than proposal one.

Over the first few pursuits together, cycle times drop as the library fills in.

Track record.

Numbers from pursuits this team has run on our clients' behalf. Every submission goes out under the client's name, so you won't find agency names, contract titles, or client firms on this page. The numbers are what we can show.

~63%
Won or shortlistedof decided competitive pursuits
$1B+
In program ceilingsacross contracts won
< 1 wk
Fastest full proposala complete municipal CM proposal, delivered end to end
Pursuit mix
SOQs for on-call benches Multiple-award task order contracts (MATOC / IDIQ) Project-specific RFPs with technical approach Construction and program management pursuits Engineering and consulting on-calls Prime submissions and sub-consultant packages Transit Ports Rail Municipal public works West Coast public agencies

Won-or-shortlisted rate is the share of decided competitive submissions won or advanced to the shortlist or interview stage; in-progress and under-evaluation pursuits excluded. Program values are agency-stated ceilings, shared across awardees, not guaranteed awards.

What clients say.

"Outstanding work. To generate two great-looking proposals at the same time is amazing."

President & CEOConstruction management firm

"We submitted our SOQ for a challenging IDIQ pool, on an unusual schedule, and the team made it as comprehensive and thorough as it could possibly be."

Project AnalystConstruction management firm

"The final SOQ was sent and accepted by the agency. The team was very responsive with the AI-generated and human-written content and pulled it all together graphically."

Three ways to start.

Scope and terms are set on a short call, based on how many pursuits you run, which modules you hand us, and what the work costs you today. No hourly billing, whichever door you take.

Send us one RFP

Send the solicitation. We come back with what we'd cover, how fast we can turn it, and a quote for that pursuit alone. The lowest-commitment way to see the team work.

Send us the RFP →

Run a pilot

A defined set of proposals over a fixed window, so you see the writing, the design, and the process on real pursuits before committing to a lane.

Book a call →

Open a lane

A dedicated team running one proposal at a time, month to month. Add lanes for the busy season and hand them back when it passes. Your knowledge base compounds with every pursuit.

Book a call →

Before you decide.

Will anyone know Purely Works was involved?
No. The work goes out under your name, in your templates, with your reviewers' sign-off, and we don't publish client names, agency names, or contract titles anywhere, including on this page. How visible the team is inside your firm is your call: some clients introduce us as their proposal team, others keep us behind the scenes.
Who actually writes it, a person or AI?
A dedicated writer leads every pursuit and owns what gets said. AI systems trained on your library carry the load underneath: first drafts from your past work, the compliance matrix, résumé reformatting, consistency checks. Every figure, résumé, and project sheet is then verified by hand, and drafts are built to a zero-comment standard, meaning recent submissions cleared internal review with minimal or no comments.
How fast can a lane start?
Plan on a week or two to load your library and learn your voice before the first pursuit. If a deadline is already on the calendar, tell us on the call and we'll plan around it.

More questions, including subs, low-volume firms, and work outside construction? Read the full FAQ

Send us the next RFP.

Nothing confidential needed. Tell us the agency, the due date, and roughly what's being asked for, and a proposal manager will come back with how we'd run it and what it would take.

  • A straight read on fit: which modules we'd own, and where your team should stay in the loop
  • A realistic timeline against the due date, including onboarding if this is our first pursuit together
  • A quote for that pursuit, or for a lane if that's the better shape
Prefer to talk? Book a call →

Tell us about the pursuit

Agency, due date, and scope are enough to start. A proposal manager reads this and replies.

One proposal manager reads this, one proposal manager replies. No sequence, no drip.

Got it. We're reading it now.

A proposal manager will reply with how we'd run it and what it would take. If the deadline is tight, book a call and we'll talk it through live.